Tuesday, 20 December 2011
Upstairs bathroom, painted
Monday, 19 December 2011
A week later
Bathrooms upstairs and down are being fitted. the tiler was here over the weekend and so was Alex, fitting the shower panels. Today Andy has been fitting the sinks and taps upstairs and down. Tomorrow, I will be painting the upstairs bathroom.
Ben has been shipped off to his Gran's for the week to give Anne and I a chance to crack on. The poor boy was being neglected here and we were struggling to get much done. Jenny has been our saviour this week. What would we do without her?
Photos to come..l
Monday, 12 December 2011
Utility room - done!
Sunday, 11 December 2011
Weekend shift over
Saturday, 10 December 2011
Weekend work update
This week the sparkles will second fix, Alex will be sorting the upstairs bathroom out, the plasterers will be coming to do the downstairs and upstairs bathrooms and Andy the plumber will be finishing his stuff off. We're hoping to have at least a temporary kitchen for Christmas.
Wednesday, 7 December 2011
Week 17 - midweek report
My job has been concentrating on getting the kitchen whited out. So far I've done 3 coats on the ceiling and 2 on the walls. I am hint that the ceiling will be ok now and that I'll just have to give the walls one more, but I'll see in the morning.
The lads from hotbox have been on site all day and the stove in nearly installed and the flu sprayed.
Alex h been working on bits and bobs, mainly upstairs. The skylight is now in the bathroom and the room has been opened up into what was the storage area.
All in all, it feels like it has been a productive day.
Tuesday, 29 November 2011
Partition wall in kitchen
This is what the kitchen units will sit up against and then worktop will run along, with cupboards and dishwasher under and sink on top. On the other side we'll have a family dining table and the settle up against the wall.
Monday, 28 November 2011
Week 16 - start of the week post
This week we should get the radiators fixed in place downstairs and the under floor heating activated. Soffits and fascias should be done this week as well, with a bit of luck. We've also got some more plaster boarding to get done in the lounge and utility, then get that skimmed over.
Alex started building a timber partition wall in the kitchen last week, which is where the sink, dishwasher etc will fit. So I expect he'll be finishing that off too.
This is my last week in work before I take annual leave until after Christmas, so I can concentrate on getting work done in the house. Feeling optimistic at the moment about being warm and comfortable for Christmas, but there's still a lot to do!
Friday, 25 November 2011
Wednesday, 23 November 2011
Lounge, screed and bricked up
Well, here it is. This is the view of the lounge from the doorway. The screed is down and you can now see the bricked up apex. The view down the garden is still great and there's plenty of light in the room from the other windows. On balance, I think it's been the right decision.
Tuesday, 22 November 2011
Lounge drying out
this is a picture from the window in the lounge, looking back towards the main house. The plaster is drying nicely. Should be able to get cracking with the paint in a couple of weeks when I finish work.
Our bedroom downstairs
Totally re-skimmed, skirting and door frames sanded down. It's nearly dry and will be ready for painting this weekend.
Hallway
Delph racks have been removed. The whole thing has been skimmed over. Door frames have been sanded down. We'll be painting it this weekend coming.
Monday, 21 November 2011
Week 15 - update
When I came home on Fri night, Ben and Anne were in the bedroom sponging the wood floor. Apparently Ben had been at it for an hour. When I went to lock the hens up I was having a look round what had been done and through the chipboard which is blocking entry to the main house, I heard him say, "That was a big job Mummy, I'm tired now." What a grafter. Anne and I are determined to do nice things with him during weekends, after all this is over.
Anyway, this weekend Anne and I (& Ben) got the hallway and our downstairs bedroom prepared by sanding all the skirting and architrives. We killed the sander in the process, but it had had a good life. The plaster should have dried by the end of the week, so we can get on with painting and undercoating the wood. The final layer of colour on the walls and gloss on the wood, will go on when everyone has buggered off.
On Saturday morning, Alex, Lee and Simon came and barrowed through some concrete to the sun room and utility. Kingspan was also laid throughout the lounge. Andy the plumber came later and put the 'tails' in place for the underfloor heating and connected up the manifold.
Today, the underfloor heating pipes should get laid and hopefully Alex will brick up the end apex in the lounge (might take him Mon-Wed to do this).
Tomorrow, the screed is going down over the underfloor heating.
There are lots of little finishing off jobs to be done, like soffits and fascias, utility boarding and skimming other areas which have been left etc. Then of course, we have second fix plumbing and electrics to get done.
I got some updated pictures yesterday and will post them this week.
Tuesday, 15 November 2011
View from the outside
Things are moving much more quickly and taking shape now. Still 5 weeks left until Christmas, so we're hoping that things will stay on track.
The screed will now be going in next Tuesday, rather than Fri this week. That means that Ben and I will be on gardening duty all weekend, clearing leaves and maybe chopping wood.
Our new bedroom and the hallway should be plastered by the end of the week, so might be ready for painting early next week.
Lounge window frame
Alex has put the window frame in place, so we can see what it would look like. however, as discussed in a previous post, we will still be blocking up to the apex, despite how nice it looks.
Monday, 14 November 2011
Week 14 - Monday update
It should be a pretty busy week this week with all that's going on:
Mon/Tues the windows should arrive and get put in. (Simon & Alex)
Plastering front bedroom and hallway (Keith & Johnny)
Ridge tiles and pointing on the roof finished off (Stan and Robbie)
Mon - finishing off skimming in the kitchen and maybe boarding out some of the other areas (utility and sun room - Mike).
Next Wed, we have the kitchen fitter (Trevor Kettlewell) coming to get his measurements so he can go off and build the kitchen. We hope to have that fitted the week before Xmas.
Thurs, screed goes down to level the whole area (kitchen, utility, sun room, lounge)
Updates to follow during the week...
kingspan in the utility room
Spent a lot of the day yesterday and all day last Friday getting the insulation in place in the sun room and the utility room. It's pretty much all done now.